S3DA Design was contracted with the full permit set design for a Popeyes Chicken Restaurant to be built in 201 West Dr. Martin Luther King Jr Boulevard, Stockton CA. The project includes Design, Structural, MEP, Civil, and Landscape drawings. The project is the 3rd Pepeyes Restaurant currently followed by S3DA Design engineering teams and is expected to be finished in Jan. 2022.

News
Developing MEP design and Title 24 for Wilkins Apartments in Los Angeles
S3DA was tasked with providing designs for HVAC systems, power services, lighting, and plumbing for Wilkins Apartments, which consist of ten units and five stories.As the plans do not align from floor to floor, S3DA