Anaheim Victory Baptist Church

S3DA submitted the completed MEP design for Victory Baptist Church at 227 Magnolia Ave. Anaheim, CA 92801.

The scope of work for the 64114 SF actual area type III-B, two-story church, and school was:

The mechanical ventilation per mechanical code requirements and manual S calculation per energy code requirement. Also, single line diagram and demonstrate the electrical power distribution system/concept, panel schedules electrical circuits, and electrical outlet location per code requirements. We are providing an isometric diagram for cold/hot water and gas piping. Finally modeled the building envelope and building system by the latest EnergyPro for Title 24 compliance.