
Feb 21, 2025
Comprehensive MEP Design and System Upgrades for Mason’s Super Dogs, 850 WILLOUGHBY WAY, SUITE 102, Atlanta, GA
The ATLANTA BELTLINE EASTSIDE MARKETPLACE
S3DA provided MEP design services to enhance electrical, HVAC, and plumbing systems, ensuring optimal performance and compliance.
Scope Highlights:
Mechanical: HVAC system design with heat load reports, rigid ductwork, exhaust hood and fan layouts, roof plans, and system schedules.
Electrical: Updated panel schedules, lighting and power plans, single-line diagrams, and electrical specifications.
Plumbing: New grease trap integration, domestic water and drainage layouts, wastewater riser diagrams, gas piping, and isometric riser diagrams.
This project reflects S3DA’s commitment to delivering efficient and code-compliant engineering solutions tailored to project needs.
