
MEP Design for a Fourplex in Jacksonville, FL
S3DA Design provided comprehensive MEP engineering services for a new fourplex residential development in Jacksonville, Florida. This multifamily project required efficient, code-compliant systems to support modern living across multiple dwelling units.
S3DA’s Scope
- Mechanical Design
- Mechanical specifications and general design criteria
- Heating and cooling load calculations
- HVAC floor plans with optimized system layouts
- Rigid ductwork design coordinated with building structure
- Roof-mounted equipment plans
- Mechanical schedules, calculations, and detailed documentation
- Electrical Design
- Electrical specifications and general notes
- Lighting and power distribution plans
- Panel schedules and load calculations
- Single-line diagrams (SLD) for system clarity and coordination
- Plumbing Design
- Plumbing specifications and system criteria
- Domestic water and sanitary drainage floor plans
- 2D riser diagrams for water and waste systems
- Natural gas layout and isometric riser diagrams
- Plumbing schedules, calculations, and detailed design
Key Challenges & Solutions
Designing MEP systems for a fourplex requires balancing efficiency, space constraints, and system independence for each unit. S3DA leveraged BIM-based coordination (Revit) to integrate mechanical, electrical, and plumbing systems seamlessly within the building layout. This approach minimized clashes, optimized routing, and ensured maintainability while meeting Florida building codes and energy requirements.
The Result
S3DA delivered a fully coordinated, permit-ready MEP design package that enhances occupant comfort, energy efficiency, and long-term system performance. The integrated design approach streamlined construction and reduced potential field conflicts, ensuring a cost-effective and timely project delivery.
