
MEP design for Avalon Civic Center Housing Project, Tremont St., Avalon, CA
Our team has been engaged to deliver comprehensive MEP engineering design services for the Avalon Civic Center Housing Project in Avalon, CA.
Phase 1 involves preparing the SD set and 50% DD set, including a building load study, water system materials, HVAC specifications, panel sizing, MEP routing, and Title 24 compliance narrative. Detailed designs cover HVAC load reports and layouts, electrical power distribution and low-voltage systems, and plumbing systems with both domestic water and saltwater sanitary provisions.
Phase 2 advances the design to the 50% DD set and CD set, expanding into fully detailed mechanical, electrical, and plumbing documentation, including coordination with the utility provider and complete construction-ready plans.
This multi-phase approach ensures that the project is delivered with efficiency, accuracy, and compliance, while meeting the unique demands of Avalon’s Civic Center Housing development.
