MEP Design – Sheikh Shoes Retail Store | Happy Valley,  OR

Sheikh Shoes Retail Store

MEP Design – Sheikh Shoes Retail Store | Happy Valley,  OR

S3DA Design was engaged to provide Mechanical, Electrical, and HVAC design services for a new Sheikh Shoes retail store. The scope of work focused on upgrading building systems to meet modern retail standards while maintaining efficiency and compliance.

Electrical Design:

  • Integration with existing utility service and new main distribution board.
  • Complete power distribution system, including branch circuit panel boards.
  • New exit signs, interior lighting, façade lighting, and controls.
  • Power supply for HVAC and other miscellaneous equipment.
  • Rough-ins for outlets and low-voltage systems per owner’s requirements.

HVAC Design:

  • New HVAC system with air distribution devices, load calculations, and air balance.
  • Exhaust fans for restrooms and associated ductwork.
  • Mechanical schedule and HVAC air distribution plans.

Energy Compliance:

  • Energy documentation for lighting and HVAC systems in accordance with state-approved prescriptive methods.

This project enhances customer comfort, safety, and energy efficiency, following design standards from other successfully completed Sheikh Shoes locations.

Unlock the potential of your projects with S3DA’s expertise.

×