Multi-Tenant Shop building
S3DA will start on the Mechanical and Plumbing design for the American Cancer Society at Sun West Shopping Center, Lodi, CA.
The scope of work is Mechanical and Plumbing design for the American Cancer Society
The MEP design will be provided for the following items:
The mechanical ventilation per mechanical code requirements and manual S calculation per energy code requirement. Also, single line diagram and demonstrate the electrical power distribution system/concept, panel schedules electrical circuits, and electrical outlet location per code requirements. We are providing an isometric diagram for cold/hot water and gas piping. Finally modeled the building envelope and building system by the latest EnergyPro for Title 24 compliance.