The scope of work: Providing B.Regs. Package.
The objective of this project was to prepare a Building Regulations Package for a two story residential house based on the client’s already performed planning that was provided by another architectural firm.
We had to design the foundation and steel beams with two columns in the middle of the building based on the architectural plans.
The challenges that we faced was caused by a gap in the top of the designed roof and we have to find a solution for that.
We considered a couple of steel beams on both sides along the gap but due to the remaining large span, we had to add two columns to reduce the overall span.
Our deliveries:
Structural drawings and details.
Calculation Report.
Project Time frame: 1 week and we met the schedule achieving the client’s satisfaction.

Client:

  Philippe – B

Date:

  August 2018

Location:

  Murray Road, London