Ricas Nieves Ice Cream shop
S3DA is starting on the MEP design for the Ice Cream shop at 154 W. 131 St. Los Angeles, CA 90061.
The scope of work is MEP design will be provided for the following items:
The mechanical ventilation per mechanical code requirements and manual S calculation per energy code requirement. Also, single line diagram and demonstrate the electrical power distribution system/concept, panel schedules electrical circuits, and electrical outlet location per code requirements. We are providing an isometric diagram for cold/hot water and gas piping. Finally modeled the building envelope and building system by the latest EnergyPro for Title 24 compliance.