The objective of this project was to design a Loft conversion, Rear and side extension
This project was referred to us by the partner firm that had already done the planning stage and asked us to provide the building regulation package and calculation report.
We were provided by an initial design for the structure, and we had to adjust it with the architectural drawings.
The challenges that we faced:
Reducing the size of the beams and so max. Used UKC sect. was UKC 152x152x30.
Project Time frame: 2 weeks, and was fulfilled achieving both the partner firm and the client’s satisfaction.
Client:
Philipe-
Date:
August 2018
Location:
Danson Cres – Welling