S3DA Design was requested to provide Structural and MEP design for 225 E EDSEL, Detroit, MI 48202. The project consisted of the construction of a 5 story building with slab on grade. The new building was planned to be about 60 feet high and constructed over the area where an existing single story building with basement was present. The request included structural, MEP and fire suppression/water line sizing plan set for an ICF building. Also, the client asked us to do the building in 6” core ICF with either build block or nudura ICF with no interior shear walls because of having an ICF building.