Location: Sacramento, C

  Style: Structural Design

  Date: Jan. 2021

 

S3DA Design was requested the structural design for Express Carwash and Oil Change Facility in 6325 STOCKTON BOULEVARD SACRAMENTO, CA. 95824. The facility had a two-story part and the roof was considered to be prefabricated truss. The design consisted of the following date and requirements:
LOT DATA:
PARCEL SIZE : 63,162 SF (1.45 AC)
EXISTING ZONING : C-2-SPD GENERAL COMMERCIAL /SPECIAL PLANNING DISTRICT
PROPOSED ZONING: C-2-SPD GENERAL COMMERCIAL /SPECIAL PLANNING DISTRICT
EXISTING USE : CARWASH / OIL CHANGE FACILITY
PROPOSED USE : CARWASH / OIL CHANGE FACILITY

REQUIRED:
EXPRESS CARWASH TUNNEL (3,720 SF) = EXEMPT
CARWASH OFFICE (1568 SF TOTAL) = 3 SPACES
(1 SPACE PER 500 SF)
OIL CHANGE FACILITY (2,077 SF) = 4 SPACES
(1 SPACE PER 500 SF)
REQUIRED = 7 SPACES