The Hidden Cost of Changing a Floor Plan After Construction Starts
Wanting to move a doorway a couple of feet doesn’t sound like the sort of decision that should derail a building project. Neither does making the kitchen slightly bigger or taking a bit of space from the room next door. If you’re still in the planning stage, it probably won’t, but once work has already started, changing a detail like that can become a lot more expensive than you realise.
You might not think tweaking a floor plan slightly would have much impact, but you also have to take into account the pipe routes, the socket positions, and the materials that have already been ordered and measured. Not to mention the tradespeople booked are based on the initial plan.
Changing the floor plan at this stage no matter how small you think the change may be, will not only be costly but also set the project back. In this article we’ll uncover the hidden details you may have not thought about and how to avoid making these changes when it’s too late.
Moving a Wall Can Mean Undoing Work You’ve Already Paid For
Construction may have already started and you think that moving a wall slightly to the left would give you more space in the kitchen. It can’t be that difficult, it’s only one wall right? Well once that wall has been built, someone then has to take it down. If it has already been plastered and had electrical work run through it, there’s even more to undo. If the wall is carrying weight from above, you can’t simply decide halfway through the project that you’d rather have it somewhere else. An engineer may need to look at the change again and work out whether additional support is required. Suddenly, your “small change” has involved several people before anyone has even started rebuilding it. And then it has to be put back up.
Kitchens and Bathrooms Are Particularly Awkward to Move
Changing the position of a bedroom is hard enough, but kitchens and bathrooms can cause far more problems. That’s because plumbing is involved. Say you want the kitchen sink to now sit underneath the window because you think it will look better there, and it just makes more sense. But now the plumber has to work out whether water pipes can reach the new position. There may be joists in the way and pipe runs may need changing. Work that was already finished needs opening up again and you’re left paying twice for the work to be done.
The Electrics Also Follow The Floor Plan
Sockets, switches and lighting aren’t just placed randomly, they’re based on how the room is expected to work. Move a kitchen island after the electrical work has already been planned and suddenly the pendant lights that were originally above it don’t look right anymore. Now an electrician has to be paid to rework the electrics so the lighting is the right position for the new layout changes.
The same problem occurs in the bedroom. Change the position of the bedroom wall and the sockets that were meant to sit neatly beside the bed might now be in the completely wrong place. If the wiring has already been installed now you have the cost of an electrician coming back and alter work that was perfectly fine when they did it in the first place.
This is where the cost of late changes slowly starts to creep in. You aren’t only paying for the thing you changed but you’re paying for everything else that has to change with it.
Then There Are the Things You’ve Already Ordered
By the time building work begins, there’s a good chance parts of the project have already been measured, designed or ordered. If a run of kitchen cabinets has been made to fit a particular wall and you suddenly make that wall shorter with layout changes, the cabinets now don’t fit. This means you may have to pay to change the order or even replace the units if you’ve already received them. This is a cost that could have been avoided in the first place if you were happy with the floorplan before construction started. The same thing can happen with fitted wardrobes, doors and other made-to-measure parts of the project.
Change Your Mind While It’s Still Easy
None of this means you have to get your floor plan perfect on the first attempt. Quite the opposite. The planning stage is where you should be moving things around and changing your mind. Try the kitchen island in three different positions. Check whether there’s actually enough room to walk around the dining table once the chairs are pulled out. Think about where the bedroom door opens once there’s a bed and wardrobe in the room.
It’s much easier to realise something doesn’t work while you’re still looking at a plan than when you’re standing in front of a newly built wall. This is also where tools like the Arcadium 3D room designer can be useful. You can build the floor plan to scale, add furniture and then move through the design in 3D before anything is built. It gives you a chance to spot awkward layouts and test different ideas while changing them still costs nothing more than a bit of time.
It won’t replace the architectural or engineering drawings needed for the actual build. It can, however, help you feel far more confident about the layout you’re signing off.
Final Thoughts
Changes happen during building projects. Sometimes something unexpected turns up behind a wall or a decision genuinely needs to be reconsidered. But changing a floor plan because you only realized halfway through the build that the room doesn’t work is a very expensive way to test an idea.
Using design tools like the Arcadium 3D room designer or floor planner helps you spend more time with the layout before work starts. Put furniture in it. Think about how doors will open and where people will actually walk. When the floor plan is still on a screen, changing your mind is easy. Once the builders are working from it, that same decision can affect far more